MODULAR CASE STUDIES

Green Dot Phase III exterior

Green Dot Phase III

Green Dot contacted IMS with a concept for a three phase approach for starting a new high school in Memphis, Tennessee.
SXU Exterior

Saint Xavier Art Studio

IMS was contacted by Saint Xavier University in Chicago, IL to create a permanent building for their 3-D Art Studio.
Highland 10.6.20

Daycare Center

Highland Park Community Nursery School and Day Care Center (HP Community) was in need of a building solution that was time sensitive and budget friendly.
ORA9-Exterior-Front

9th Grade Campus

Modular addition to the current high school that included 9 classrooms, a science lab, a computer lab, administrative space, a cafeteria, a warming kitchen, storage space, 2 restroom modules and 10 ft wide corridors.
SPLK-1A-Exterior

Alternative Education Building

IMS constructed a 4-classroom permanent modular school building with offices and restrooms. The district wanted an upgraded facility that would provide the students with an educational environment that was equal to that of the recently updated high school.
ORAE-Exterior-2

Elementary School Campus

The fast-track construction of this school was accomplished by building two, two story classroom wings centered around a two story glass atrium.
TBLA-Exterior-21

Jr High/ High School Campus

The design utilized individual wings for the middle and high schools, which were connected and separated by a central core of common shared services such as the media-center, science laboratories, art rooms, and cafeteria.
Exterior_1

Detroit Middle School Campus

The IMS team constructed a 2-story modular addition, connected to the existing building with an enclosed corridor, to serve as the school’s educational wing. The building was installed and secured in 7 days.