MODULAR CASE STUDIES

Walgreens Modular Case Study

Walgreens Case Study

Walgreens had an urgent need for building space at multiple retail locations in Chicago and Minneapolis; they required temporary pharmacies to continue serving customers during renovation and rebuilding of their existing stores.
Healthnet-Case-Study

Temperature Check Station

HealthNet of Indianapolis, Indiana needed a Single Point Temperature Check Station for COVID-19 testing.
Dynoprop Exterior

Modular Sales Office

IMS teamed up with A&E firm Wight and Company to provide a temporary modular building to use as a real estate sales showroom for Eco18 Development.
Waste Management

Scale House

Modular construction proved to be an effective solution because it was designed, built, delivered and installed in approximately 2 months.
Exterior

Healthcare Building

A large urban hospital system was in the process of implementing an aggressive 10-year master building and renovation plan.
Berkeley Exterior

Modular Office Building

Innovative Modular Solutions installed a 2,352 sq ft. modular building in its space with a custom interior design that was created to accommodate the staff’s work flow.
Ashland_Exterior

Cosmetology School Building

The Ashland Community and Technical College (ACTC) cosmetology program was operating in an aging facility and desired to relocate the program to an upgraded location.
Dominos Front_exterior

Quick Serve Restaurant

By utilizing modular construction and leveraging the experience of the IMS project team, Domino’s was able to continue their mission to be number one and the world leader in pizza delivery