Educational Modular Building Case Studies

Mason City Exterio

Mason City Modular Case Study

Mason City School had an urgent need for additional classroom space during their renovation for their main school.
Millennium Modular Charter School

Ohio Elementary School Campus

IMS and Stevens Architects designed a 58,000 square foot building solution, based on standard IMS Specifications, which offered benefits to the schedule and project cost.
Green Dot Phase III exterior

Green Dot Phase III

Green Dot contacted IMS with a concept for a three phase approach for starting a new high school in Memphis, Tennessee.
SXU Exterior

Saint Xavier Art Studio

IMS was contacted by Saint Xavier University in Chicago, IL to create a permanent building for their 3-D Art Studio.
Highland 10.6.20

Daycare Center

Highland Park Community Nursery School and Day Care Center (HP Community) was in need of a building solution that was time sensitive and budget friendly.
ORA9-Exterior-Front

9th Grade Campus

Modular addition to the current high school that included 9 classrooms, a science lab, a computer lab, administrative space, a cafeteria, a warming kitchen, storage space, 2 restroom modules and 10 ft wide corridors.
SPLK-1A-Exterior

Alternative Education Building

IMS constructed a 4-classroom permanent modular school building with offices and restrooms. The district wanted an upgraded facility that would provide the students with an educational environment that was equal to that of the recently updated high school.
ORAE-Exterior-2

Elementary School Campus

The fast-track construction of this school was accomplished by building two, two story classroom wings centered around a two story glass atrium.