CASE STUDIES

Healthnet-Case-Study

Temperature Check Station

HealthNet of Indianapolis, Indiana needed a Single Point Temperature Check Station for COVID-19 testing.
TBLA-Exterior-21

Jr High/ High School Campus

The design utilized individual wings for the middle and high schools, which were connected and separated by a central core of common shared services such as the media-center, science laboratories, art rooms, and cafeteria.
ANK-Exterior

Magnet School for the Arts

The modular building includes classrooms for Art, Science, Social Studies, Music, Theater and Band along with mechanical rooms, technology rooms and restrooms.
Ashland_Exterior

Cosmetology School Building

The Ashland Community and Technical College (ACTC) cosmetology program was operating in an aging facility and desired to relocate the program to an upgraded location.
Thurston_exterior

Ann Arbor Modular Campus

Ann Arbor Public Schools is a fast growing school district with the largest growth currently in their K-5 grades. The district was in need to quickly add space at 4 of their sites for the 2017-2018 school year.
New Trier High School

School Construction Swing Space

The proposed solution to this challenge was to use modular buildings for the Technical Arts spaces. IMS provided two 7-plex building to allow for large footprint classrooms to appear as one large room for offices studios, labs and shop areas.
Minot-featured

Minot School District

The District, working cooperatively with FEMA, turned to Kraus Anderson Construction Company (KA) of Minneapolis, Minnesota to assist with flood recovery efforts, both temporary and long-term.
Front of the building

Temporary Modular Campus

In June of 2016, a disastrous flood hit the county of Kanawha; Elkview, West Virginia and surrounding areas. The flooding was a result of massive rains, falling more than 10 inches in a 24 hour period.