CASE STUDIES

Wellspan-Website-MBI-Cover-Photos.png

Wellspan Case Study

Wellspan Health & Surgery Center required the addition of an MRI unit to their existing facility. Originally, Wellspan was looking to add a mobile imaging trailer to fulfill their need.
Highland Park Exterior

Daycare Center

Highland Park Community Nursery School and Day Care Center (HP Community) was in need of a building solution that was time sensitive and budget friendly.
Park-Nicollet-Exterior

Modular Imaging Suite

The speed and knowledge used during this project allowed Park Nicollet Health Services to minimize any cost overruns, and to generate revenue more quickly through an earlier start-up.
lititz-exterior

MRI Imaging Modular Building Addition

The building was designed to blend with the existing structure and met all requirements of the 3.0 Tesla MRI system including RF and Magnetic shielding.
ORA9-Exterior-Front

9th Grade Campus

Modular addition to the current high school that included 9 classrooms, a science lab, a computer lab, administrative space, a cafeteria, a warming kitchen, storage space, 2 restroom modules and 10 ft wide corridors.
SPLK-1A-Exterior

Alternative Education Building

IMS constructed a 4-classroom permanent modular school building with offices and restrooms. The district wanted an upgraded facility that would provide the students with an educational environment that was equal to that of the recently updated high school.
ORAE-Exterior-2

Elementary School Campus

The fast-track construction of this school was accomplished by building two, two story classroom wings centered around a two story glass atrium.
Waste Management

Scale House

Modular construction proved to be an effective solution because it was designed, built, delivered and installed in approximately 2 months.